Scroll
The project consists of reconstruction of Kiev-Chop Road (km 322+500 – km 348+000) and two transport interchanges..
Client: Government Service of Ukrainian Highways “Ukrautodor”.
The project includes engineering of two road interchanges at km 322+500 and km 340+000, reconstruction of 2 bridges and 2 overpasses, reconstruction of II - category road of 17.5 km length and reconstruction of I - category road of 8.5 km length.