Scroll

Nikki Beach

Location

Azerbaijan

Expansion of the Nikki Beach Artificial Peninsula (Sea Breeze)

Hydrotrans Engineering has developed a coastal modernization project for the Nikki Beach area. The primary objective is the expansion of the peninsula’s left bank to increase the usable land area and enhance its recreational potential.

Engineering Solutions

The design (project code GTP-XM-28/25-1.2) incorporates precise geographical coordinates of the Caspian coastline and neighboring areas (Bilgah, Kurdakhani, Zagulba).

  • Technical Framework: The plan is based on high-precision topographic surveys and geometric calculations (including R56 design radii).

  • Outcome: Ensuring the reliable and safe expansion of the land area to support the further development of the Nikki Beach resort infrastructure.

  • slide
Hydro

Look other project

Engineering of the bridges and overpasses on Baku-Samur highway at кm 28-89 which is the part of “North-South” Corridor