Scroll

Design of the Boyukshor – Pirshagi Road

Location

Azerbaijan

Hydrotrans Engineering has completed the design works for the new Boyukshor – Pirshagi road, which has become an important part of the transport infrastructure, aimed at improving connectivity between Baku and Pirshagi.

The project was developed in accordance with modern engineering standards, taking into account road safety requirements and the specifics of the terrain. The new road will significantly increase traffic capacity and reduce travel time to just 22 minutes.

Key Project Specifications:

  • Total length — 12.7 km

  • Roadbed width — 30.6 m

  • Lane width — 3.5 m

  • 6 lanes of traffic

  • 3 interchanges

  • 4 bridges

  • 1 overpass

The design works were carried out from November 5, 2023, and were completed on schedule, enabling the timely start of construction.

Hydrotrans Engineering continues to contribute to the development of modern and safe transport infrastructure across the country

  • slide
Hydro

Look other project

Engineering of the complex of 14-storey residential buildings