Marine Dredging and Navigation Channel Project

Location

Azerbaijan

Modernization of Baku International Sea Trade Port and Dredging Project

Hydrotrans Engineering has developed a large-scale project to increase the port's capacity to 260,000 TEU. The primary objective is the dredging of the navigation channel to ensure the safe passage of large-tonnage vessels.

Navigation Channel Specifications

The project covers 198.8 hectares, supported by bathymetric surveys across 2,486 hectares.

  • Length: 8,465 meters.

  • Width: 160 meters on straight sections, expanding to 212 meters at bends.

  • Depth: Target dredging level is set at -8.80 m.

  • Traffic: Designed for efficient two-way vessel traffic.

Port and Logistics Infrastructure

The master plan incorporates the expansion of onshore facilities to streamline cargo flow:

  • Cargo Terminal: Extensive open-air warehouses and specialized container handling zones.

  • TIR Parking: Facilities with a total capacity for 487 heavy-duty trucks (import, export, and general zones).

  • Service Area: Equipped with weighbridges, cargo scanners, maintenance workshops, and truck washes.

  • Ferry Infrastructure: Direct integration with two dedicated export ferry lines.