Scroll
The Client is the Ministry of Transport, Communications and High Technologies of Azerbaijan Republic
The engineering of railway bridges is a laborious and lengthy process, requiring considerable time and resources.
The project included:
• Total length of overpass - 1146 m
• Tunels (2 nos.) - 80 m, 30 m
• Railroad bridges - 2 nos.
• Double-line road, length - 75,85 m, width -11,5 m
• Double-line road, length - 65,76 m, width - 13,43 m
• Approach roads - 3300 m, 13 aver. = 16 m
• Retaining walls 3 10 m
• Bridge total length – 75.85
• Bridge overall dimensions – 11.5 m