Scroll
Design Works Continue on the Mughanly–Ismayilli–Gabala Road
Hydrotrans Engineering continues work on the design of the Mughanly–Ismayilli–Gabala highway.
We are developing modern infrastructure that will enhance regional connectivity and improve road safety.
As part of the current phase of work:
— the road is being expanded to four lanes
— travel time and transportation costs are being reduced
— two bridges and a tunnel through the mountain are being designed to ensure direct and convenient access
Technical specifications:
— Length: 14 km
— Road width: 21 m
— Includes: 2 bridges and 1 tunnel
The project supports sustainable regional development and aims to make transportation safer, more comfortable, and more efficient
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more
Read more