Scroll
The Client is the Ministry of Transport, Communications and High Technologies of Azerbaijan Republic
The bridge is designed at the 55th km of I category road Alat-Astara over the river Kura. Superstructure consists of a monolithic prestressed beams. Spans designed as symmetrically repeated five spans on scheme 50 + 50 + 151 + 50 + 50 meters. The third bridge span (central span) is located over the river and is 151 meter.
This span additionally suspended by ropes on a metal arch.